The world's First Thermal Generating Station ........ The world's Oldest Power Station ........ The Oldest Hydro Electric Dam in Nigeria ........ The world's Oldest and Existing Power Station -1 ........ The world's Oldest and Existing Power Station -2 ........ The world's Oldest and Existing Power Station -3 ........ The World Oldest Nuclear Power Plants still in Use ........ The world's First Hydro Generation Plant ........ The World's Largest Generating Unit Today ........ The World's Largest Solar Power Plant in 2023 ........ The World's Longest Transmission Line ........ Michael Faraday's Contribution to Electricity ........ James Watt's Contribution to Power Generation ........ Ampère, André Marie’s contribution to electricity ........ Thomas Edison’s Contribution to Electricity ........ The World's Largest Dam ........ The World's Oldest Geothermal Power Plant ........ The Oldest Power Station in Nigeria

PART XII - ACQUISITION OF LAND AND ACCESS TO LAND


Part XII of the Electricity Act 2023 comprises only section 118. Its purpose is to ensures that land acquisition for electricity projects is done fairly and transparently, balancing the needs of electricity projects with the rights of landowners.

The following are the highlights of this section:



Land Acquisition for Electricity Projects
  • Voluntary and Compulsory Procedures: Land and access rights for electricity projects are acquired through both voluntary and compulsory procedures in compliance with this Act, the Land Use Act, and relevant regulations.
Access Rights for Licensees
  • Entitlement: Generation, transmission, and distribution licensees have access rights over lands, buildings, and streets to fulfill their obligations under their licenses. These rights are defined by the Commission’s regulations.
Disposal of Unrequired Land
  • Offer to Previous Holder: If a licensee no longer needs the land acquired through compulsory acquisition, they must offer it back to the previous holder at a price reflecting the value of improvements made by the licensee.

  • Alternate Offer: If the previous holder is not interested, the land can be offered to others under terms directed by the Commission.

Advertisement

Renewable Energy Renewable Energy Renewable Energy Finance Off-Grid Projects Blue Print Off-Grid Solar Power Renewable Energy Handbook Smart 4K Projector with WiFi and Bluetooth Mini Projector with WiFi 6 and Bluetooth 5.4 Epson Home Cinema 1100 3-Chip 3LCD Wireless Thinnest Smart Grid: Technology and Applications 1st Edition Smart Grid Redefined: Transformation Power System SCADA and Smart Grids 1st Edition Power Purchase Agreement A Complete Guide - 2020 Edition Paperback The Power of Agreement Hardcover – January 1, 1999  The Power of Agreement Paperback – March 25, 2014 Safety, Health, and Environmental Concepts for the Process Industry 2nd Edition HOSTINGHER WEBSITE BUILDER ADVERT Safety, Health, and Environment 2nd Edition Safety and Health for Engineers 4th Edition Occupational Health and Safety Management: A Practical Approach, Third Edition 3rd Edition Occupational Health and Safety for the 21st Century: . 1st Edition